Memorial Union Project May Progress Photos

Photos from the latest project site walk. This is the ninth in a monthly photo update series for this academic calendar year. Be sure to visit the Campus Renewal Blog again next month for more photos of Memorial Union construction progress. Also be sure to check out the live webcam.

2 thoughts on “Memorial Union Project May Progress Photos

  • June 4, 2021 at 7:18 pm
    Permalink

    To Whom May Concern,

    Behind the Memorial Union left wing their are several support casings being constructed that are not shown in any of the drawings. What is this going to become?

    Interior drawings also shows that the left wing to have seating in a stadium configuration. Is this going to be a slide out seating/multi purpose configuration?

    Michael Hinderlie

  • June 11, 2021 at 8:40 am
    Permalink

    Thanks for your question, Michael!

    The area in question shown under construction on the webcam is an outdoor patio that will include seating.

    Early design concepts for the interior space you referenced included a potential option of a retractable seating system. The final design for this venue includes a flat carpeted floor. The venue will serve as a secondary Small Ballroom that can be configured to support a variety of event types.

    Hope this helps answer your question.