Campus Renewal

UND construction, planning and restoration updates.

Foot bridge near Smith Hall closed for repairs until Nov. 4

The foot bridge crossing the English Coulee between Smith Hall and the President’s Residence is closed for concrete repairs until Saturday, Nov. 4.

Sidewalk sections on the west side of the coulee, near and leading to the bridge, are also being replaced. UND Facilities Management advises pedestrians to use alternate routes during the closure period.

The image below shows the construction area.