{"id":10083,"date":"2025-08-01T14:47:23","date_gmt":"2025-08-01T19:47:23","guid":{"rendered":"https:\/\/blogs.und.edu\/jdosas\/?p=10083"},"modified":"2025-11-17T09:56:25","modified_gmt":"2025-11-17T15:56:25","slug":"und-odegard-ground-station-commissioning","status":"publish","type":"post","link":"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/","title":{"rendered":"Commissioning the Odegard Ground Station"},"content":{"rendered":"<figure id=\"attachment_10093\" aria-describedby=\"caption-attachment-10093\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/blogs.und.edu\/jdosas\/wp-content\/uploads\/sites\/51\/2025\/11\/OGS-w-Operator-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-10093 size-full\" src=\"https:\/\/blogs.und.edu\/jdosas\/wp-content\/uploads\/sites\/51\/2025\/11\/OGS-w-Operator-2.jpg\" alt=\"Two UND Satellite Operators conducting nominal operations for the UND ROADS Mission\" width=\"1464\" height=\"975\" srcset=\"https:\/\/blogs.und.edu\/jdosas\/wp-content\/uploads\/sites\/51\/2025\/11\/OGS-w-Operator-2.jpg 1464w, https:\/\/blogs.und.edu\/jdosas\/wp-content\/uploads\/sites\/51\/2025\/11\/OGS-w-Operator-2-300x200.jpg 300w, https:\/\/blogs.und.edu\/jdosas\/wp-content\/uploads\/sites\/51\/2025\/11\/OGS-w-Operator-2-1024x683.jpg 1024w, https:\/\/blogs.und.edu\/jdosas\/wp-content\/uploads\/sites\/51\/2025\/11\/OGS-w-Operator-2-768x512.jpg 768w, https:\/\/blogs.und.edu\/jdosas\/wp-content\/uploads\/sites\/51\/2025\/11\/OGS-w-Operator-2-1320x879.jpg 1320w\" sizes=\"auto, (max-width: 1464px) 100vw, 1464px\" \/><\/a><figcaption id=\"caption-attachment-10093\" class=\"wp-caption-text\">Jacob Stanley (top left) and Austin Null (bottom left) operate a satellite pass for the UND ROADS mission in the newly commissioned Odegard Ground Station, with Morgan Giuseponi (bottom right) and Dr. Ronald Fevig (top right) assisting.<\/figcaption><\/figure>\n<h2>Launching the Commissioning Phase of UND&#8217;s Ground Station<\/h2>\n<p>On <strong>July 23rd<\/strong>, UND proudly welcomed three engineers from Added Value Solution (AVS) to begin commissioning the <strong>Odegard Ground Station<\/strong>, the future hub of the UND Space Operations Group (SOG) and a training ground for UND\u2019s next generation of satellite operators.<\/p>\n<p>Weeks earlier, key components\u2014including the <strong>Server Rack, VHF\/UHF Antennas, S\/X Band Dish Antenna, and Mission Control Center (MCC) Desk<\/strong>\u2014had arrived on campus and were stored on site. With everything in place, the team kicked off an <strong>eight-day effort<\/strong> that demanded planning, coordination, and collaboration between UND Facilities, UND Networking, the Space Operations Group, and external partners.<\/p>\n<h2>From Unboxing to Assembly<\/h2>\n<p>Day 1 began with a kickoff meeting and the unboxing of materials. With the MCC desk already assembled by SOG, students were ready to jump in and support AVS engineers as the work began.<\/p>\n<p>Over the next two days, <strong>assembly was in full swing<\/strong>. AVS engineers took charge of the <strong>UHF\/VHF Antennas<\/strong> and the <strong>Server Rack<\/strong>, while SOG handled the assembly of the <strong>S\/X Band Dish Antenna<\/strong>. For many students, this was a highlight, as they received hands-on experience with hardware that will become a cornerstone of their training in satellite operations.<\/p>\n<h2>Overcoming Challenges<\/h2>\n<p>Day 4 brought one of the most memorable challenges: crane operations. Preassembled components needed to be lifted to the fourth floor, where the ground station resides. Suddenly, a torrential downpour of rain threatened the server rack while it was still outside.<\/p>\n<p>With quick thinking, the team covered the equipment as best as they could and then worked together to <strong>manually lift the 500-pound server rack<\/strong> through the building entrance. It took <strong>eight people in total<\/strong>, rotating positions to maneuver the rack through tight spaces until it was safely inside. This moment captured the teamwork and determination that defined the entire project.<\/p>\n<h2>Wiring, Testing, and Calibration<\/h2>\n<p>Days 5 and 6 focused on wiring and electrical work, handled primarily by AVS engineers. Much to everyone\u2019s relief, the server rack showed no signs of water damage and powered on nominally.<\/p>\n<p>The final two days were dedicated to <strong>testing and calibration<\/strong>. AVS split into two groups: one took the <strong>FlatSat<\/strong><b> <\/b>(a testbed made up of the satellites\u2019 internal components) and a signal generator to the airport roof, while the other remained at the ground station. Using this setup, the team calibrated the antennas and confirmed the software was ready to establish contact with <strong>UND ROADS 1 &amp; 2<\/strong>.<\/p>\n<h2>Looking Ahead<\/h2>\n<p>After eight days of intense work, the <strong>Odegard Ground Station is nearly commissioned<\/strong>. AVS engineers will continue remote refinements to finalize requirements before handing off nominal operations to UND.<\/p>\n<p>In the meantime, SOG will begin conducting passes and attempting communications with UND ROADS 1 &amp; 2 as student operators continue their training. The next major milestone? <strong>The handoff of nominal operations to UND and the start of the next phase of the ROADS Mission: Far-Field Rendezvous<\/strong>, where one satellite will begin maneuvering to \u201ccatch up\u201d with the other.<\/p>\n<p>The future is bright for UND\u2019s space program, and this commissioning marks another step toward establishing the University of North Dakota as a leader in small satellite operations.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Launching the Commissioning Phase of UND&#8217;s Ground Station On July 23rd, UND proudly welcomed three engineers from Added Value Solution (AVS) to begin commissioning the Odegard Ground Station, the future hub of the UND Space Operations Group (SOG) and a training ground for UND\u2019s next generation of satellite operators. Weeks earlier, key components\u2014including the Server [&hellip;]<\/p>\n","protected":false},"author":242,"featured_media":10093,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[478,250],"tags":[],"class_list":["post-10083","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-roads-mission","category-space"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Commissioning the Odegard Ground Station - John D. Odegard School of Aerospace Sciences<\/title>\n<meta name=\"description\" content=\"UND and AVS have commissioned the Odegard Ground Station, marking the final milestone before launching satellite operations on campus.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Commissioning the Odegard Ground Station - John D. Odegard School of Aerospace Sciences\" \/>\n<meta property=\"og:description\" content=\"UND and AVS have commissioned the Odegard Ground Station, marking the final milestone before launching satellite operations on campus.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/\" \/>\n<meta property=\"og:site_name\" content=\"John D. Odegard School of Aerospace Sciences\" \/>\n<meta property=\"article:published_time\" content=\"2025-08-01T19:47:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-17T15:56:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blogs.und.edu\/jdosas\/wp-content\/uploads\/sites\/51\/2025\/11\/OGS-w-Operator-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1464\" \/>\n\t<meta property=\"og:image:height\" content=\"975\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"mgiuseponi\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"mgiuseponi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/2025\\\/08\\\/und-odegard-ground-station-commissioning\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/2025\\\/08\\\/und-odegard-ground-station-commissioning\\\/\"},\"author\":{\"name\":\"mgiuseponi\",\"@id\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/#\\\/schema\\\/person\\\/feec3bb7b10bb9d1d41f9f0606c00004\"},\"headline\":\"Commissioning the Odegard Ground Station\",\"datePublished\":\"2025-08-01T19:47:23+00:00\",\"dateModified\":\"2025-11-17T15:56:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/2025\\\/08\\\/und-odegard-ground-station-commissioning\\\/\"},\"wordCount\":576,\"image\":{\"@id\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/2025\\\/08\\\/und-odegard-ground-station-commissioning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/wp-content\\\/uploads\\\/sites\\\/51\\\/2025\\\/11\\\/OGS-w-Operator-2.jpg\",\"articleSection\":[\"ROADS Mission\",\"Space Studies\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/2025\\\/08\\\/und-odegard-ground-station-commissioning\\\/\",\"url\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/2025\\\/08\\\/und-odegard-ground-station-commissioning\\\/\",\"name\":\"Commissioning the Odegard Ground Station - John D. Odegard School of Aerospace Sciences\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/2025\\\/08\\\/und-odegard-ground-station-commissioning\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/2025\\\/08\\\/und-odegard-ground-station-commissioning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/wp-content\\\/uploads\\\/sites\\\/51\\\/2025\\\/11\\\/OGS-w-Operator-2.jpg\",\"datePublished\":\"2025-08-01T19:47:23+00:00\",\"dateModified\":\"2025-11-17T15:56:25+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/#\\\/schema\\\/person\\\/feec3bb7b10bb9d1d41f9f0606c00004\"},\"description\":\"UND and AVS have commissioned the Odegard Ground Station, marking the final milestone before launching satellite operations on campus.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/2025\\\/08\\\/und-odegard-ground-station-commissioning\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/2025\\\/08\\\/und-odegard-ground-station-commissioning\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/2025\\\/08\\\/und-odegard-ground-station-commissioning\\\/#primaryimage\",\"url\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/wp-content\\\/uploads\\\/sites\\\/51\\\/2025\\\/11\\\/OGS-w-Operator-2.jpg\",\"contentUrl\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/wp-content\\\/uploads\\\/sites\\\/51\\\/2025\\\/11\\\/OGS-w-Operator-2.jpg\",\"width\":1464,\"height\":975,\"caption\":\"Two UND Satellite Operators conducting nominal operations for the UND ROADS Mission\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/2025\\\/08\\\/und-odegard-ground-station-commissioning\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Commissioning the Odegard Ground Station\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/#website\",\"url\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/\",\"name\":\"John D. Odegard School of Aerospace Sciences\",\"description\":\"News and information from the UND John D. Odegard School of Aerospace Sciences.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/#\\\/schema\\\/person\\\/feec3bb7b10bb9d1d41f9f0606c00004\",\"name\":\"mgiuseponi\",\"url\":\"https:\\\/\\\/blogs.und.edu\\\/jdosas\\\/author\\\/mgiuseponi\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Commissioning the Odegard Ground Station - John D. Odegard School of Aerospace Sciences","description":"UND and AVS have commissioned the Odegard Ground Station, marking the final milestone before launching satellite operations on campus.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/","og_locale":"en_US","og_type":"article","og_title":"Commissioning the Odegard Ground Station - John D. Odegard School of Aerospace Sciences","og_description":"UND and AVS have commissioned the Odegard Ground Station, marking the final milestone before launching satellite operations on campus.","og_url":"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/","og_site_name":"John D. Odegard School of Aerospace Sciences","article_published_time":"2025-08-01T19:47:23+00:00","article_modified_time":"2025-11-17T15:56:25+00:00","og_image":[{"width":1464,"height":975,"url":"https:\/\/blogs.und.edu\/jdosas\/wp-content\/uploads\/sites\/51\/2025\/11\/OGS-w-Operator-2.jpg","type":"image\/jpeg"}],"author":"mgiuseponi","twitter_misc":{"Written by":"mgiuseponi","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/#article","isPartOf":{"@id":"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/"},"author":{"name":"mgiuseponi","@id":"https:\/\/blogs.und.edu\/jdosas\/#\/schema\/person\/feec3bb7b10bb9d1d41f9f0606c00004"},"headline":"Commissioning the Odegard Ground Station","datePublished":"2025-08-01T19:47:23+00:00","dateModified":"2025-11-17T15:56:25+00:00","mainEntityOfPage":{"@id":"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/"},"wordCount":576,"image":{"@id":"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/#primaryimage"},"thumbnailUrl":"https:\/\/blogs.und.edu\/jdosas\/wp-content\/uploads\/sites\/51\/2025\/11\/OGS-w-Operator-2.jpg","articleSection":["ROADS Mission","Space Studies"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/","url":"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/","name":"Commissioning the Odegard Ground Station - John D. Odegard School of Aerospace Sciences","isPartOf":{"@id":"https:\/\/blogs.und.edu\/jdosas\/#website"},"primaryImageOfPage":{"@id":"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/#primaryimage"},"image":{"@id":"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/#primaryimage"},"thumbnailUrl":"https:\/\/blogs.und.edu\/jdosas\/wp-content\/uploads\/sites\/51\/2025\/11\/OGS-w-Operator-2.jpg","datePublished":"2025-08-01T19:47:23+00:00","dateModified":"2025-11-17T15:56:25+00:00","author":{"@id":"https:\/\/blogs.und.edu\/jdosas\/#\/schema\/person\/feec3bb7b10bb9d1d41f9f0606c00004"},"description":"UND and AVS have commissioned the Odegard Ground Station, marking the final milestone before launching satellite operations on campus.","breadcrumb":{"@id":"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/#primaryimage","url":"https:\/\/blogs.und.edu\/jdosas\/wp-content\/uploads\/sites\/51\/2025\/11\/OGS-w-Operator-2.jpg","contentUrl":"https:\/\/blogs.und.edu\/jdosas\/wp-content\/uploads\/sites\/51\/2025\/11\/OGS-w-Operator-2.jpg","width":1464,"height":975,"caption":"Two UND Satellite Operators conducting nominal operations for the UND ROADS Mission"},{"@type":"BreadcrumbList","@id":"https:\/\/blogs.und.edu\/jdosas\/2025\/08\/und-odegard-ground-station-commissioning\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/blogs.und.edu\/jdosas\/"},{"@type":"ListItem","position":2,"name":"Commissioning the Odegard Ground Station"}]},{"@type":"WebSite","@id":"https:\/\/blogs.und.edu\/jdosas\/#website","url":"https:\/\/blogs.und.edu\/jdosas\/","name":"John D. Odegard School of Aerospace Sciences","description":"News and information from the UND John D. Odegard School of Aerospace Sciences.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blogs.und.edu\/jdosas\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/blogs.und.edu\/jdosas\/#\/schema\/person\/feec3bb7b10bb9d1d41f9f0606c00004","name":"mgiuseponi","url":"https:\/\/blogs.und.edu\/jdosas\/author\/mgiuseponi\/"}]}},"_links":{"self":[{"href":"https:\/\/blogs.und.edu\/jdosas\/wp-json\/wp\/v2\/posts\/10083","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.und.edu\/jdosas\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.und.edu\/jdosas\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.und.edu\/jdosas\/wp-json\/wp\/v2\/users\/242"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.und.edu\/jdosas\/wp-json\/wp\/v2\/comments?post=10083"}],"version-history":[{"count":11,"href":"https:\/\/blogs.und.edu\/jdosas\/wp-json\/wp\/v2\/posts\/10083\/revisions"}],"predecessor-version":[{"id":10097,"href":"https:\/\/blogs.und.edu\/jdosas\/wp-json\/wp\/v2\/posts\/10083\/revisions\/10097"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.und.edu\/jdosas\/wp-json\/wp\/v2\/media\/10093"}],"wp:attachment":[{"href":"https:\/\/blogs.und.edu\/jdosas\/wp-json\/wp\/v2\/media?parent=10083"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.und.edu\/jdosas\/wp-json\/wp\/v2\/categories?post=10083"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.und.edu\/jdosas\/wp-json\/wp\/v2\/tags?post=10083"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}